Connect Smartsheet, build your Gantt, run your jobs with AXIOM QX.
Open your browser. Go to app.axiomqx.com/start-trial.
Create your account with your company email. A card is required at sign-up. The first 30 days are free. Nothing is charged until day 31.
Click Connect Smartsheet. Smartsheet opens and asks you to sign in to your own account and authorize AXIOM. Click Allow. AXIOM never sees or keeps your Smartsheet password. It runs under the authorization you just gave it.
Click Deploy Templates. AXIOM builds your workspace and starter projects inside your Smartsheet account. Takes about 15 seconds.
Both buttons show green checkmarks. You're connected. Next time you log in, you land on your Home page.
If the Smartsheet window doesn't appear, allow popups for app.axiomqx.com in your browser settings. This is the most common setup issue.
You need your own paid Smartsheet subscription. You pay Smartsheet for it directly. It is not part of the AXIOM price. If you don't have Smartsheet yet, get a subscription before you start.
When you clicked Deploy Templates, AXIOM created two workspaces in your Smartsheet:
Every project folder has exactly two sheets:
Gantt Sheet: your project schedule. Tasks, milestones, durations, predecessors, selections, sub and supplier assignments. AXIOM identifies it by the Task Name and Start Date columns.
Client Portal Sheet: payments, documents, change orders, credits, notices, client uploads. AXIOM identifies it because it does NOT have Task Name and Start Date columns.
AXIOM identifies which sheet is which by column structure, not by name. You can rename the sheets anything you want. AXIOM will still find them.
Open Smartsheet. Go to your AXIOM QX workspace. Open a project folder. Click on the Gantt sheet. This is where you build your schedule.
Go to the Task Name column. Read each task. If it applies to your project, keep it. If not, delete the row. Add any tasks that are missing. Put them in build order, top to bottom.
Go to the Duration column. For each task, type the number of days it takes. Framing: 5 days. Plumbing: 3 days. Roofing: 2 days.
Go to the Start Date column. Click the cell for your FIRST task only. Pick the date work begins. Smartsheet calculates every other date from durations and predecessors.
Go to the Predecessors column. For each task, type the row number of the task that must finish before this one starts. Example: if Plumbing is row 8 and it can't start until Framing (row 5) is done, type 5 in Plumbing's Predecessors cell.
Go to the Assigned To column. Type the email address of the sub or supplier doing this task. This is how AXIOM knows which rows go on which person's portal. Each sub or supplier sees only his own rows.
| Column | How to use it |
|---|---|
| Task Name | The name of each task, in build order. Parent rows are phases (Foundation, Framing). Child rows are individual tasks underneath. |
| Duration | Number of days this task takes. Smartsheet calculates the end date. |
| Start Date | Set only the first task's start date. Everything else calculates from predecessors. |
| End Date | Calculated automatically. Don't type here. It fills in from Start Date and Duration. |
| Predecessors | Row number of the task that must finish first. Creates the dependency chain. |
| Assigned To | Email address of the sub or supplier. Feeds the sub and supplier portals. |
| % Done | Progress percentage (0-100). Updated from the Jobsite Tracker or directly in Smartsheet. |
| Stage | Status tracking: Quarter (Start Process), Half (In Progress), Three Quarter (Ordered), Full (Complete/On-Site). |
| Show Schedule | Checkbox. Check = client sees this task on their portal. Uncheck = internal only. |
| Selection Required | Checkbox. Check = client needs to make a decision. Turns on selection tracking and alerts for that row. |
| Finalize By | Date. When you need the client's selection decision. Drives the selection alerts. |
| Supplied By Owner | Checkbox. Checked = client supplies the material. Unchecked = you supply it. |
| On Site | Checkbox. Checked = shows a green ON SITE badge on the client portal. |
| Comments | Free text notes. Displayed on the portal for each task. |
Once you fill in Task Name, Duration, Start Date, and Predecessors, the Gantt chart builds itself in Smartsheet. You'll see bars, dependencies, and a visual timeline.
Move one task and everything downstream shifts. Change a duration and end dates recalculate. Add a predecessor and the dependency chain updates. AXIOM reads this data from your sheet, so your portals and Home page show the latest schedule.
Build your schedule in Smartsheet. The Gantt sheet is your source of truth. AXIOM reads it. AXIOM writes to your sheets only when a person presses a button in AXIOM: you saving an edit on Project Control, your super pressing Save to Smartsheet in the Jobsite Tracker, a homeowner authorizing a change order, confirming an item ordered, or uploading a file, or a supplier pressing Mark ordered or Mark on site. Nothing writes on its own. AXIOM never adds, renames, or deletes a column in your sheets.
Open the second sheet in your project folder, the Client Portal sheet. This is where payments, documents, change orders, credits, and notices live.
The sheet is organized by section numbers in Column 1. Each section has a specific purpose:
| Section | What it holds | Which columns to use |
|---|---|---|
| Section 1 | Documents | Column 3 = description. Attach files directly to each row using Smartsheet's attachment feature. |
| Section 2 | Payment Schedule | Col 3 = milestone name. Col 5 = amount. Col 6 = date. Col 7 = status (Not Billed / Billed / Paid). |
| Section 3 | Change Orders | Col 3 = description. Col 5 = amount. Col 6 = date. Col 7 = status (Pending / Approved / Not Doing). |
| Section 4 | Credits | Col 3 = description. Col 5 = amount. Col 6 = date. Col 7 = status. |
| Section 5 | Pricing Required | Col 6 = date. |
| Section 6 | Notices | Col 2 = visibility checkbox. Col 3 = notice text. Col 6 = date. |
| Section 7 | Client Uploads | Col 3 = selection name. Col 6 = date. Client uploads files through the portal. |
Find Section 2 in the sheet (look for "2" in Column 1).
Add a new row under Section 2. In Column 3, type the description, for example "Foundation Complete."
In Column 5, type the amount, for example 25000.
In Column 6, enter the date (optional).
In Column 7, type the status. Start with "Not Billed." Change to "Billed" when you invoice. Change to "Paid" when the client pays.
Find Section 1 in the sheet.
Add a new row. In Column 3, type the document name, for example "Architectural Plans."
Right-click the row. Click Attachments. Upload your file. The file attaches to that row and shows on the client portal.
Change orders, credits, and notices follow the same pattern. Add a row in the right section and fill in the columns. The portal shows what's in the sheet.
Go to app.axiomqx.com. Click Project Control in the sidebar.
Click + New Project. A dropdown appears showing every folder in your AXIOM QX Smartsheet workspace.
Select the project folder. AXIOM finds the Gantt and Client Portal sheets inside it.
Enter the client's name, address, phone, and email.
AXIOM generates a 4-digit PIN. This is what your client types to open their portal.
Click Deploy to Smartsheet. Your project is connected.
Open the job in Project Control. On the Client tab, turn on the Portal switch. The Client Portal card shows the portal is live.
On the Client Portal card, send the invite, or click copy link to put the portal link on your clipboard.
If you copied the link, text or email it to your client with their 4-digit PIN. They open it on any device. No app. No account.
Turn on the Alerts switch. AXIOM starts sending selection reminder emails to your client once a day. Turn on Weekly Report for the Monday morning email. Turn on Uploads to let your client send you files.
Your project is running. Everything your client sees on the portal comes from your Smartsheet. Update your sheet and the portal shows the change. Your super updates progress from the job site with the Jobsite Tracker on his phone.
The Jobsite Tracker lets your super update the Gantt from his phone. He walks the job, taps progress on each task, and presses Save to Smartsheet once at the end.
Your super opens the Jobsite Tracker on his phone and signs in with his email and a 4-digit PIN.
He picks the job.
He taps a task and sets its progress.
He moves to the next task. Tap, update, move on. The changes pile up on his phone.
He taps Save to Smartsheet once. Every change goes to your Gantt in one save.
The Tracker writes two columns only: % Done and Stage. Your portals and Home page show the new progress.
Not Started: empty. No work begun.
Quarter: Start Process. Work being prepared.
Half: In Progress. Work underway.
Three Quarter: Material Ordered. Materials in transit.
Full: Del./On-Site. Complete or delivered.
Nothing goes to Smartsheet until he presses Save to Smartsheet. Your Smartsheet is always the source of truth.
Your client opens the portal link and enters their 4-digit PIN. Everything they see comes from your Smartsheet. The Gantt sheet feeds the schedule. The Client Portal sheet feeds payments and documents.
Who is on site now, the move-in date, overall progress, a button to call you, and your notes to the client.
Contract Total, Paid, Due Now, and Balance. Calculated from your rows in the Client Portal sheet. The payment schedule shows each draw.
Every task where Show Schedule is checked in your Gantt. Progress bars, On-Site badges, start and end dates.
Every task where Selection Required is checked, with its status and Finalize By date. For items the owner supplies, the client presses Confirm ordered when they've ordered it.
Files attached to Section 1 rows in the Client Portal sheet. NEW badges on documents the client hasn't opened.
Section 3 rows. The client sees the description and amount and presses Authorize to proceed, Not authorized, or Ask a question. When they authorize, AXIOM writes "Authorized to proceed" with their name and the date into your sheet.
Section 4 rows. Description and amount. Credits work the same way as change orders.
Section 6 rows where the visibility checkbox is checked.
Section 7. With the Uploads switch on, your client can upload a file through the portal. AXIOM attaches it to your sheet and emails it to you.
Update your Smartsheet and the portal shows it. Add a payment row, upload a document, check a box, and the client sees it the next time they open the portal.
Any email address in the Assigned To column of your Gantt sheet shows up on your Subs & Vendors page. Their tasks show up across all your projects.
Click Subs & Vendors in the sidebar. You'll see every email from your Assigned To columns. Mark each person as a Sub or a Vendor.
Click Deploy next to a name. AXIOM emails them an invite with their portal link and PIN. That invite is the only email AXIOM sends them.
Subs open the link, enter the PIN, and see every job they're on for you. Only their own rows, with a weather line for each job. The sub portal is view only. Subs can't change anything.
Suppliers get the same view for the jobs they supply. They press Mark ordered, then Mark on site. Each press writes the stage to your sheet and adds a dated note.
Turning a portal off: On the Subs & Vendors page, switch the person to OFF and his portal stops working. Switch him back to LIVE to turn it on again.
Go to Smartsheet. Open the Axiom Templates workspace.
Right-click the master Gantt sheet. Click Save as New. Choose your AXIOM QX workspace. Create a new folder with your project name. Save.
Do the same for the master Client Portal sheet. Save it into the same new folder.
Go back to AXIOM and add the project (Section 05). Your new folder is in the dropdown.
No extra fees. No project cap. Copy, rename, done.
Never edit the master templates in Axiom Templates. Always copy first. If you mess up a sheet, copy a fresh one.
When you check Selection Required and set a Finalize By date in your Gantt sheet, AXIOM emails reminders as the deadline gets close. Alerts go out only when the job's Alerts switch is on. AXIOM checks once a day, and each alert is sent once.
Due in 7 days: reminder to the client
Due in 3 days: reminder to the client
Overdue, days 0 to 2: alert to the client
Overdue, days 3 to 4: alert to the client and to you
Overdue 5 or more days: urgent alert to the client and to you
Selection complete: sent when the selection is done
When a new file is added to the job, the client gets one email for it in that same once-a-day run.
The reminders go out on their own, so you spend less time chasing selections.
Every Monday morning, AXIOM emails your client next week's scheduled work, pulled from your Gantt. Turn on the job's Weekly Report switch in Project Control to send it.
Go to Axiom Templates in Smartsheet. Copy the master sheets into a new folder in your AXIOM QX workspace. Then add it in AXIOM. See Section 10.
Open the job in Project Control. The PIN is on the Client Portal card. Text it to them again.
Go to the Client Portal sheet in Smartsheet. Find Section 3. Add a row. Column 3 = description, Column 5 = amount, Column 6 = date, Column 7 = status (Pending). The client sees it on their portal and can authorize it to proceed.
Same as a change order but in Section 4. Add a row with description, amount, date, status.
Go to Section 2 in the Client Portal sheet. Find the payment row. Change Column 7 from "Not Billed" to "Billed" or "Paid." The portal shows the new status.
Go to Section 1 in the Client Portal sheet. Add a row with the document name. Right-click the row, click Attachments, upload the file. It appears on the client portal with a NEW badge.
Build your schedule (tasks, dates, assignments) in Smartsheet. Run each job (portal switches, PIN, client info) from Project Control in AXIOM. When you save an edit in Project Control, AXIOM writes it to your sheet. Your super updates % Done and Stage from his phone with the Jobsite Tracker.
Yes, when the job's Uploads switch is on. Clients upload through their portal. AXIOM attaches the file to Section 7 of your Client Portal sheet and emails it to you.
Go to Subs & Vendors in AXIOM and switch the person to OFF. His portal stops working. Switch him back to LIVE to turn it on again.
No. The portal is a website. Any browser, any device. Link and PIN.
No. Subs and suppliers open their portal link and enter their PIN. No Smartsheet account, no AXIOM account.
You keep everything. Your jobs, your schedules and your money live in your Smartsheet and your bank. AXIOM holds your account, not your data. You lose the portals and alerts. Cancel anytime from inside the app: Settings, Billing.
Follow Sections 01 through 06 for your first project.
Every page in the app has Tour this page and Show me how on desktop. For anything else, open Support in the app and write a ticket. You can attach a screenshot. A person answers, usually the same day. You can also email support@axiomqx.com. Training videos are at axiomqx.com/training.